Project consists of 2 bridges with interchange ramps that provide above grade crossing over RT 11. It requires the import of approximately 500,000 cubic yards of soil to construct the fill areas on both sides of the bridges.
Project consists of 2 bridges with interchange ramps that provide above grade crossing over RT 11. It requires the import of approximately 500,000 cubic yards of soil to construct the fill areas on both sides of the bridges.